Fax: E-mail: [email protected] Website: .. ELECTRICAL SAFETY RULES. . Supply repealing the Indian Electricity Rules, vide notification. 3, CEIG – Extra High-High Voltage Electrical Installations-Indian Electricity Rules Pre-commissioning Texts of Electrical Apparatus And Equipments, Act and Rules. The Electricity Act, The Central Electricity Authority ( Measures relating to safety and Electric supply) Regulations, A.P. Cinemas .

Author: Gokinos Dijar
Country: Yemen
Language: English (Spanish)
Genre: Education
Published (Last): 1 November 2007
Pages: 13
PDF File Size: 16.35 Mb
ePub File Size: 3.68 Mb
ISBN: 207-2-75497-162-3
Downloads: 38492
Price: Free* [*Free Regsitration Required]
Uploader: Mezirg

Precautions to be adopted by consumers, owners, [occupiers], electrical contractor, electrical workmen and suppliers:.

Clearance from buildings of high and extra-high voltage lines: Installation and testing of generating units: Penalty for breach of rule 45 — Where any electrical installation work of the nature specified in sub rule 1 of rule 45 has been carried out otherwise than —. Provided that the provisions contained in this sub-rule shall have effect in respect of the person already authorised to operate or undertake maintenance of any part or whole of generating station as aforesaid from the date to be specified by the appropriate Government, but such a date shall not be later than a period of [6 years, 2 months from the date this rule comes into force.

Provided that no consumer or occupier shall commission his generating plant of a capacity exceeding 10KW without the approval in writing of the Inspector]. Such tools and devices shall always be maintained in sound and efficient working conditions].

Provided that the provisions contained in this sub-rule shall have effect in respect of the person already authorised to operate or deig maintenance of any part or whole of generating station as aforesaid from the date to be specified by the appropriate Government, but such a date shall not be later than a period of [6 years, 2 months from rulee date this rule comes into force.

Provided that the supplier may energize the aforesaid electric supply lines or apparatus for the purpose of tests specified in rule Such tools and devices shall always be maintained in sound and efficient working conditions].

The Consumer, Owner ceiy occupier, the contractor If any or the person through whom the work is being carried out and the person under whose immediate supervision the work is rulles carried out, shall each be punishable with fine which may extend to Three Hundred Rupees. The supply of energy shall not be commenced by the supplier unless and until the Inspector is satisfied that the provisions of Rules 65 to 69 both inclusive have been complied with and the approval in writing of the Inspector has been obtained by him: Provided that no consumer or occupier shall commission his generating plant of a capacity exceeding 10KW without the approval in writing of the Inspector].

Handling of electric supply lines and apparatus: Construction, installation, protection, operation and maintenance of electric supply lines and apparatus: Clearance from buildings of high and extra-high voltage lines: All ducts provided for ruls cables and other service shall be provided with fire-barrier at each floor crossing.

  EISENBAHNGESETZ 1957 PDF

TamilNadu Electrical Licencing Board

Provided that rulles the rulfs of works executed for or on behalf of the central Government and in the case of installations in mines, oil-fields and railways, the Central Government and in other cases the State G overnment may, by notification in the Official Gazette, exempt, on such conditions as it may impose, any such work described therein either generally or in the case of any specified class of [consumer,Suppliers,Owners or Occupiers],from so much of this sub-rule as requires such work to be carried out by an electrical contractor licensed by the State Government in this behalf.

Construction, installation, protection, operation and maintenance of electric supply lines and apparatus: Penalty for breach urles rule 45 — Where any electrical installation work of the nature specified in sub rule 1 of rule 45 has been carried out otherwise than —.

Provided that in the case of works executed for or on behalf of the central Government and in the case of installations in mines, oil-fields and railways, the Central Government and in other cases the State G overnment may, by notification in the Official Gazette, exempt, on such conditions as it may impose, any such work described therein either generally or in the case of any specified class of [consumer,Suppliers,Owners or Occupiers],from so much of this sub-rule as requires such work to be carried out by an electrical contractor licensed by the State Government in this behalf.

Handling of electric supply cfig and apparatus: Provided that the supplier may energize the aforesaid electric supply lines or apparatus for the purpose of tests specified in rule Clearance from buildings of low and medium voltage lines and service lines: Provided further that where the generator, motor, transformer or other apparatus cceig within an enclosure, one notice affixed to the said enclosure shall be sufficient for the purposes of this rule.

Precautions to be adopted by consumers, owners, [occupiers], electrical contractor, electrical workmen and suppliers: Additional provisions for supply and use of energy in multi-storeyed buildings more than 15 meters in height: All ducts provided for power cables and other service shall be provided with fire-barrier at each floor crossing.

Installation and testing of generating units: Medias this blog was made to help people to easily download or read PDF files. Precautions against leakage before connection: Authorisation – 1 A supplier or a consumer, or the owner, agent or manager of a mine, or the agent of any company operating in an oil-field or the owner of a drilled well in an oil-field or a contractor for the time being under contract with a supplier or a consumer to carry out duties incidental to the generation, transformation, transmission, conversion, distribution or use of energy may authorise any person for the purpose of any or all of the following rules, namely – Sub-rule 2 of rule 36, clause a of sub-rule 1 of rule, 51, clause a of sub-rule 1 [and [clause e and f of sub-rule clause a of sub-rule 2 ] or Rule 64 sub-rule 2 of rulesub-rules 1 and 4 or rulessub-rule 4 of rulerule and sub-rule 8 of rule Additional provisions cekg supply and use of energy in multi-storeyed buildings more than 15 meters in height: Authorisation — 1 A supplier or a consumer, or the owner, agent or manager of a mine, or the agent of any company operating in an oil-field or the owner of a drilled well in an oil-field or a contractor for the time being under contract with a supplier or a consumer to carry out duties incidental to the generation, transformation, transmission, conversion, distribution or use of energy may authorise any person for the purpose of any or all of the following rules, namely — Sub-rule 2 of rule 36, clause a of sub-rule 1 of rule, 51, clause a of sub-rule 1 [and [clause e and f of sub-rule clause a of sub-rule 2 ] or Rule 64 sub-rule 2 of rulesub-rules 1 and 4 or rulessub-rule 4 of rulefeig and sub-rule 8 of rule Provided further that where the generator, motor, transformer cfig other apparatus is within an enclosure, one notice affixed to the said enclosure shall be sufficient for the purposes of this rule.

  AN INTRODUCTION TO MAGNETOHYDRODYNAMICS DAVIDSON PDF

The Consumer, Owner or occupier, the contractor If any or the person through whom the work is being carried out and the person under whose immediate supervision the work is being carried out, shall each be punishable with fine which may extend to Three Hundred Rupees. Clearance from buildings of low and medium voltage lines and service lines: Precautions against leakage before connection: Compliance with rule shall be checked by measuring the insulation resistance as provided below.

CEIG Rule-46 Testing

Compliance with rule shall be checked by measuring the insulation resistance as provided below. The supply of energy ceib not be commenced by the supplier unless and until the Inspector is satisfied that the provisions of Rules 65 to 69 both inclusive have been complied with and the approval in writing of the Inspector has been obtained cwig him: Authorisation — 1 A supplier or a consumer, or the owner, agent or manager of a mine, or the agent of any company operating in an oil-field or the.

Provided that an Inspector may direct such owner to carry such tests as he deems necessary or, if he thinks fit, accept the manufacturer’s certified tests in respect of any particular apparatus in place of test required by this sub-rule.

Provided that where it is not possible to affix such notices on any generator, motor, transformer or other apparatus, they shall be affixed as near as possible thereto [or the word “danger” and the voltage of the apparatus concerned shall be permanently painted on it]: